Tuesday, June 14, 2005

progress report...


For the benefit of those stuck overseas (and are spared the dust and noise), here is another pic of the building. Taken one day before camp. As you can see the construction has reached the 3rd floor. Phase 2 begins. This is a long phase, the contractors have to break through the ceiling of the existing 3rd floor and reinforce it, then build another floor on top of that. This phase should last till October.